- Overview
- Product Description
- Detailed Photos
- Packaging & Shipping
- Company Profile
- FAQ
Basic Info.
Product Description
Description | Galvanized Steel Tube Scaffolding Pipe | |
OD | 1.5inch, 1-1/2", 48.3mm, 48.6mm | |
Thickness | 2.5mm, 3.0mm, 3.2mm, 4.0mm | |
Length | 1-6m | |
Material | Q195, Q235, Q345, S235, S355, ASTM A500, STK500, STK400, | |
Standard | BS1139, EN10025, EN39, EN10219, JIS G3444 | |
Surface | hot dipped galvanized | |
Zinc Coating | 180-600g | |
End treatment | plain ends, threaded, grooved, bevelled | |
Payment terms | mainly TT, DP or LC, | |
Certification | ISO, SGS, BV, CCICother third party testing | |
Business type | manufacture supplier |
Our adavantage:
1. Leading Manufacturer and trading combo in China
2. nearly 20 years experience in Scaffold Tube
3. BS1139/EN39/EN10219/MS1462/ASTM A53/JIS3444/EN10255 tube available
4. Professional QC team to do in-line production and final loading quality evaluation
5. Rich experience with heavy buyers and factory audit
Scaffold tubes, also called scaffolding tubes, is the main component of the scaffolding construction system. Scaffolding tube are widely used as a temporary structure to help workers craw and repair building in height. Also scaffolding tubes are frequently be used in formwork and shoring system. The outside diameter is 48.3mm with thickness 3.2 or 4.0mm. There are different grade of scaffolding tube, such as S235, S355. Our factory has more than 15 years experience in Scaffolding tube, we can produce EN39, EN10219, BS1139 and JIS3444 standard tube. All are produced strictly according to the standard. Usually the surface is hot dipped galvanized with zinc coating above 210g/m2, which offers long term corrosion resistance.
Our factory has more than 15 years experience in steel pipe and scaffolding. For scaffolding tubes, every month more than 5,000 tons of pipes are exporting to Southeast Asia, Mideast and UK markets. We are supplier for top international scaffolding and contruction companies, and have rich expereince in quality control and factory audit.
Package: Bulk and In bundle with steel strip or as your requirement
Shiping: By Container: 20''GP, 40''GP,
Loading Port: Tianjin port, China or as your requirment
1. Q: What's your MOQ(minimum order quantity)?
A: One full 20ft container, mixed products are acceptable. We can produce as per your quantity based on different products. Please feel free to contact us, let's discuss furtherly.
2. Q: What's your packing methods?
A: Packed in bundle or bulk (customed is accepted). For steel pipes, we pack by steel strips with 61 pieces in bundle. Steel plan, steel frame, and steel prop are packed by steel strips in bundle. Couplers are in pallet.
3. Q: What's your delivery time?
A: 10-30 days after received the advance payment. For stel pipe, we can arrange shipment within 10-20 days usualy we have steel pipe in production line. For steel plank, steel prop and scaffolding frame, which need further welding, it takes 30 days. We will try our best to arrange shippment asap. Also we can arrange partial shipment based on your quantity.
4. Q: Are you manufacturer or trader?
A: We are a professional steel product manufacturer with more than 15 years of export experience. We have our own factories, one is for steel pipe, one is for galvanization, another is for scaffolding, such as steel plank, steel prop and steel frame. We have over 100 workers, with 5 welding line. Our products are exporting to Southeast and Mideast Asia, EU market. With our own factories, we can control the production cost and delivery time better. And provide you high quality goods with moderate price.
5. Q: Where's your factory?
A: Our factory is in Tianjin city (near Beijing), close to Tianjin Port. Our factory is located in the biggest steel industrial zone in China, with the steel industrial concentration, we can get raw material and fittings very fast, and arrange shipment ealrier.
6. Q: Can we visit your factory?
A: Warmly welcome. Once we have your schedule, we will arrange the professional sales team to follow up your case. It is helpful to know better about our factory. We can also do the remote inspection based on current coronavirus situation.
7. Q: Can you supply other scaffolding materials?
A: Yes. All related construction materials, such as scaffold tube, steel plank, scaffolding frame. scaffolding couplers. Besides, we can also source for you.