- Overview
- ZHONGNENGGANGLIAN
- Our Advantages
Basic Info.
Surface
Customers′t Requirement
Outer Diameter
57 - 325
Technology
Hot Rolled Cold Rolled ERW
Special Pipe
API Pipe
Oiled or Non-Oiled
Non-Oiled
Usage
Construction Structure
Color
Black....as Customers′ Requirement
End Protector
Plastic Pipe Cap
Grade
Carbon Steel
Material
Q195/Q215/Q235/Q345
Processing Service
Welding, Punching, Cutting, Bending, Decoiling
Length
12m, 6m, 6.4m
Delivery Time
Within 7 Days
Certificate
CE, ISO9001
Trademark
ZNGL
Origin
Shandong, China
Production Capacity
2500 Ton/Tons Per Week
Product Description
Type | Carbon Steel Pipe | |
Materials | API 5L /A53 /A106 GRADE B and other material which client inquired | |
Size | Outer Diameter | Seamless:17-914mm 3/8"-36" |
Wall Thickness | SCH10 SCH20 SCH30 STD SCH40 SCH60 XS SCH80 | |
SCH100 SCH120 SCH140 SCH160 XXS | ||
Length | Single random length/Double random length | |
5m-14m,5.8m,6m,10m-12m,12m or as customer's actual request | ||
Ends | Plain end/Beveled,protected by plastic caps on both ends, cut quare,grooved,threaded and coupling,etc. | |
Surface Treatment | Bare,Painting black,varnished,galvanized,anti-corrosion 3PE PP/EP/FBE coating | |
Technical Methods | Hot-rolled/Cold-drawn/Hot-expanded | |
Testing Methods | Pressure test,Flaw detection,Eddy current testing, Hydro static testing or Ultrasonic examination and also with chemical and physical property inspection | |
Packaging | Small pipes in bundles with strong steel strips,large pieces in loose; Covered with plastic woven bags; Wooden cases; Suitable for lifting operation; Loaded in 20ft 40ft or 45ft container or in bulk; Also according to customer's requests | |
Origin | China | |
Application | Conveying oil gas and water | |
Third Party Inspection | SGS BV MTC | |
Trade Terms | FOB CIF CFR | |
Payment Terms | FOB 30%T/T, 70% before shipment | |
CIF 30% pre-payment and the balance to be paid before making shipment or | ||
Irrevocable 100% L/C at sight | ||
MOQ | 10 tons | |
Supply Capacity | 5000 T/M | |
Delivery Time | Usually within 10-45 days after receipt of advance payment |